Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74313 REL 19: 2007-404-00 SN FACILITIES BON. FH ROOF REPLACEMENT
Project Number:
Title:
Spring Chinook Captive Propagation-Oregon
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
74313 REL 19
Contract Title:
2007-404-00 SN FACILITIES BON. FH ROOF REPLACEMENT
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The Bonneville Captive Brood facility was constructed in the mid-1990s near the Bonneville Hatchery and was fully funded by BPA.  BPA owns the facility and all associated fish rearing equipment and continues to funds the maintenance of the facility even when fish are not being reared.

The Bonneville Captive Brood facility has been identified as a “Rapid Response/Safety Net Facility" which can be used when an ESA listed stock has been identified as being at risk of going extinct.  The facility is used as a captive brood facility where fish are kept until mature and spawned within the facility.  Eggs produced at the facility are then be shipped to various hatcheries throughout the Columbia Basin for typical fish rearing and eventual release into the natural environment. Some of these fish may be sent back to this facility for the next cycle of captive brood fish rearing.

BPA must maintain this facility in proper working condition in the event that another ESA listed stock was crashing and a Safety Net program was needed.

The facility may be used for the rearing of non-ESA listed species or other programs with the permission from BPA.
Account Type(s):
Expense
Contract Start Date:
01/15/2018
Contract End Date:
09/30/2018
Current Contract Value:
$271,330
Expenditures:
$271,330

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA Clearance and Permits A: 165. Obtain NEPA Clearance and Permits 04/30/2018 03/31/2018
Roof Replacement B: 61. Maintain SN Facilities at Bonneville FH - One Time Roof Replacement 09/30/2018 09/28/2018
Not Applicable C: 174. Not Applicable 09/30/2018 09/30/2018
Manage Project F: 119. Manage Project 09/30/2018 09/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain NEPA Clearance and Permits 01/01/2018
B 61 Maintain SN Facilities at Bonneville FH - One Time Roof Replacement 08/14/2018
C 174 Not Applicable
D 132 No Annual Report Required 01/01/2018
E 185 Periodic Status Reports for BPA 01/01/2018
F 119 Manage Project 01/01/2018